Mary Lyon

The project provides a 5,000m² BSU facility incorporating experimental research accommodation and laboratories. Special features include robotic handling, vaporized hydrogen peroxide fumigation, air showers, discrete operational circulation flows, and a dedicated energy centre.

The two-stage contract procurement enabled the successful contractor to become involved in the detailed design development and price element packages, through sub-contract returns, to achieve a guaranteed maximum price. This was agreed with the client prior to the placement of the construction contract, at which point the design team were novated to the contractor.

Wilson Mason managed the briefing process and stimulated a creative dialogue with the client to establish a benchmark performance specification and design solution.

Our design process was characterised by a rigorous attention to the details of the project and a full investigation of the options available within the budget and site parameters.